DO NOT INSTALL, OPERATE OR SERVICE THIS PRODUCT UNLESS YOU HAVE READ AND FULLY UNDERSTOOD THE ENTIRE CONTENTS OF THIS MANUAL. FAILURE TO DO SO MAY RES
7. INSTALLATION INSTRUCTIONS 1. Using slings rated for a minimum capacity of 3000 lbs, (1500 kg), sling the deck ass
8. TEST OPERATION With the overhead door open, test operate the Vertical Storing Dock Leveler as follows to
9. CONTROL STATION OPERATIONCONTROL STATION TYPE -Independent Vertical Dock Leveler CautionYELLOW LIGHT(Proceed With
10. OPERATING INSTRUCTIONSwww.BlueGiant.comGold Series TMT ouc h C controlDISCONNECT POWERBEFORE OPENIN
10. OPERATING INSTRUCTIONSThe transport vehicle should never be allowed to depart with the lip plate resting on the
10. OPERATING INSTRUCTIONSDeck RaisingMENU DISPLAY SCREEN:Lip RaisingDeck LoweringDeck Deployedwww.BlueGiant.comG
11. MAINTENANCEMAINTENANCE & SERVICE TIME INTERVALS FOR SPECIFIC DOCK COMPONENTS CHART !!Do not operat
! WARNINGP M C H E C K L I S T – DOCK EQUIPMENT Barricade Work Area CLEANRepairs?OKCHECK / ADJUST / LUBE Repairs?OK Check Main Lift Cylinde
12. PARTS ILLUSTRATION - VERTICAL STORING DOCK 65281632115 172624278791018191312114231413143252221212223206A6B6C 16" 18"
13. COMPONENT LIST - VERTICAL STORING DOCKITEM QTY. PART NO. DESCRIPTION1 1 23-003600 Back Frame Weld2 3 23-004069 Pivot Pin3 8 013-12
TABLE OF CONTENTS1. ABOUT THE VERTICAL STORING DOCK LEVELER...
14. RECOMMENDED SPARE PARTSPart #DescriptionQty Req'd23-003585 SERVICE STAND 11)DNATS ECIVRESROF( NIP TOVIP685300
15. VERTICAL STORING DOCK LEVELER POWER PACKVIEW SHOWN WITHOUT BRACKET19 1/16"484BLUEGIANT.COMSERIAL NO.MODEL NO.BLUE GIANTPART
16. SHIPMENT KIT - VERTICAL STORING DOCK 67251413# on Diagram Part Name Part Number 1 3/1
www.BlueGiant.comGold Series TMeniusGlueBTou ch C ontro lDISCONNECT POWERBEFORE OPENING.READ AND FULLY UNDER-R#038-244EDo Not EnterProceed With
17. TROUBLESHOOTING PROBLEM CAUSEPROBLEM1. The velocity fuse located at the top of the deck cylinder is
NOTESU-SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS™ CONTROLS 23
NOTESU-SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS™ CONTROLS 24
NOTESU-SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS™ CONTROLS 25
85 Heart Lake Road SouthBrampton, Ontario, Canada L6W 3K2Phone : 905-457-3900 Fax : 905-457-2313www.BlueGiant.comBLUE GIANT EQUIPMENT CORPORATION© 20
1. ABOUT THE VERTICAL STORING DOCK LEVELERThe Blue Giant U-Series Vertical Storing Dock Leveler provides a complete energy efficient
Loading Dock Equipment ManufacturersA Product Section of Material Handling Industry of America,A Division of Material Handling Industry8720 Red Oak Bl
3.1 OPERATIONAL SAFETY WARNINGS• ONLY TRAINED PERSONNEL should operate or service this equipment.• DO NOT operate lev
4. LOCKOUT / TAGOUT PROCEDURE and RULESXXXXXXXXXXXXXXXXXXXXXXXOPERATEDO NOTABOVE: APPROVED WAY TO LOCKOUT / TAGOUTIn accordance wi
5. MAINTENANCE STRUT SETUP :Correct way to LOCK IN Maintenance Strut.Move Maintenance Strut From Stored Positi
6. STANDALONE VS DOCK ARRANGEMENTMOTOR WIRING (to Blue Genius control station)NOTE: FUSED DISCONNECT BY OTHERS BLUE GENIUS CO
7. INSTALLATION INSTRUCTIONSCONDUITACCESSHOLE 3” x 3” x 1/4”CURB ANGLE(supplied by others)REAR CURBCHANNEL ANDFRAME
Kommentare zu diesen Handbüchern